NCO Construction Album
Rust Busting
Site Survey
Foundation Forms
Dome Building Foundation Form
Pier Foundation
Dome Building Curb Form
Dome Foundation
Kerfing The Sheathing
Cutting The Sole and Top Plates
Pile O' Arcs
Sole Plate
Dome Building Wall
Top Plate Installed
Sheathing Commences
More Sheathing
Nice Scarf Joint!
Doesn't Want To Bend?Force It!
Exterior Staining
Rigging For Lift
Houston, We Have Lift-Off!
0730EDT 04/24/99
Hmmmm, Will It Fit?
It Fits!
First Light!
(First Quarter+ Moon Visible Above Dome!)
Trusses
Control Building Wall Construction
Wobbles, But Doesn't Fall!
Two More Walls To Go!
One More Wall To Go!
Thar She Blows!
Trusses in Place
Gable End Goes Up
Metal Roof Installed
The Complex
Human Forklifts Attack Pier
Pam Tests Pier Integrity
The Stately Pier
Curved Ledger To Support Deck
Rube Goldberg Clamping Of Laminated Ledger
Deck Beam and Post
Fitting Joists
More Joists
Deck Fitted Around Pier and Against Wall
Top Of Stairs Framing
Inside Wall of Circular Stair Framing
Stairwell Wall Forced-errrr Clamped Into Position
Wall To Keep One From Falling Down The Steps
The Wall Again
The Steps
The Tube
Inspecting Tube Innards
Don't Drop That Mirror!
Does It Still Work, Lee?
Luke Designs A Floor Brace
Ventilation Fan Opening
Fan Achieves First Blow
Forming The Fan Plenum
More Forming
Oak Railing
Test Fit Of Stair Gate
Constellation filler blocks for perimeter of dome deck
Two more eyes of newt and it'll be ready!
Fishing and pulling data & video cables through underground conduit
Paper template for dome carpet
($ bill at top of stairs for perspective)
Stair lights designed and installed by Walter Rison